First-pass inspection rate
Target: ≥ 95% of insulation inspections clear without rework when crews follow published compression and facing guidance on EcoBatt walls.
Completed construction projects and case studies that demonstrate reliability and long-term partnerships with contractors and developers—field results, not sustainability slogans.
We measure project success by closed walls that pass inspection on the first visit, attic fills that hit density targets, and partnerships that still answer the phone when phase three needs the same EcoBatt lot codes as phase one.
Target: ≥ 95% of insulation inspections clear without rework when crews follow published compression and facing guidance on EcoBatt walls.
Attic and cavity blown-in jobs logged against bag counts so R-value claims match installed thickness—not open-bag estimates.
Multiphase communities reserve SKU families so acoustic and thermal assemblies stay consistent when developers add buildings two years later.
On the Midwest community, the GC locked R-19 walls and R-38 attics before first slab. Knauf Insulation documentation for thermal conductivity and kraft facing details sat in the same packet as the framing schedule. Punch-list voids at electrical boxes dropped after a toolbox talk on compression. The Southeast multifamily stack used mineral wool in demising walls targeting STC performance; GREENGUARD Gold sheets cleared the indoor air Comfort review without a second submission. The light commercial retrofit shows a real limit: pipe insulation alone does not fix leaky duct joints—mechanical sealing remained a separate trade.
Share drawings, climate zone, and schedule. We will propose an insulation package and a documentation set your inspectors can file without chasing emails.